Skip to main content

Manifold Expansion Project

Patoka, Illinois

Scope of work included the installation of two, 36” diameter tank lines totaling approximately 4,500 feet in length to connect two new crude storage tanks to five separate valve manifolds that Geeding also installed and tied into existing manifolds during station outages. All associated foundations, access platforms and structural steel, valve installations, hydrotesting and commissioning were also included.