Skip to main content

Geotechnical Program

Iowa, Illinois

Included (2) 4” HDDs on feeder lines and an open trench cut on the 24” mainline. HDD operations, stoppling support for isolation, installation of engineered bridge for access across a creek, fabrication of a new 24” box sag section of pipe outside of the trench with multiple combination bends and tie-in welds.